Study of the general energy situation of Ford plant in Almussafes

AESA developed an exhaustive study on the energy situation Ford’s plant in Almussafes in order to determine the best alternative for the energy optimization of the factory. In that study was considered:

  • Main energy consumption points
  • Central power distribution system audit
  • Cogeneration plant audit
  • Analysis of alternatives for energy optimization of Ford’s plant
  • Development of Bid Specifications for the integrated energy services tender for Ford
  • Preparation of the information to be included in natural gas and electricity tender documents for Ford.

Client: Ford Almussafes

Type: Audit

Sector: Automotive

Year: 2014

Country: Spain