Energetic projects

Each project is, undoubtedly, a tailor-made suit: its conditions and requirements vary according to several factors: capability, type of thermal demand, environmental conditions, fuel availability, applicable regulations, environmental factors, expansion potential, budget. Since no two projects are the same, in AESA, we seek to understand the needs of our customers and propose them solutions that, because of our experience, we are sure that will fully satisfy.

Any project involves many disciplines and in AESA we try to cover them completely: economic, environmental, technological (process, mechanical, electrical, control,), contractual (suppliers, energy companies…) and operating (training, operation support…) aspects. We put all these disciplines available to our customers to ensure the success of the project.


results

Cogeneration plant in PCM

PAPELES Y CONVERSIONES DE MÉXICO S.A.

Cogeneration plant of 4.6 MW in simple cycle with a gas turbine and HRSG with afterburner.

Cogeneration plant in KAO Corporation

KAO CORPORATION S.A.

Substantial refurbishment of the existing cogeneration plant of KAO Corporation replacing its gas turbine for other with grater electrical output.

Cogeneration plant in Nestlé Girona

NESTLÉ ESPAÑA S.A.

Refurbishment of the first cogeneration line of Nestlé in its factory in Girona, increasing its electric power and global efficiency.

Cogeneration plant in Propilco

Propilco S.A.

Cogeneration plant of 4.8MW based on a simple cycle with a gas turbine capable to producing steam at two pressure levels.

Cogeneration plant in SEDA

Sociedad Española de Alimentos, S.A.

4.8 MW simple cycle cogeneration plant with a gas turbine and a HRSG able to produce 15 t/h of saturated steam.

Cogeneration plant in National Zinc

ZINC NACIONAL S.A.

Design and construction of a new 14.9MW combined cycle cogeneration plant for the supply of steam and electricity to Zinc Nacional-Monterrey.

Cogeneration plant in Fermic

FERMICAISE S.A. DE C.V.

Self-supply cogeneration plant (title granted by the CRE) based on a 15.22 MW simple cycle with two gas engines.

Cogeneration plant in Hule Galgo

INDUSTRIAS DE HULE GALGO, S.A DE C.V

New cogeneration plant for Industrias de Hule in its factory located in Hidalgo (México).

Cogeneration plant in UIPSA

UNIÓN INDUSTRIAL PAPELERA S.A

Replacement of current cogeneration plant for a new one based on a gas turbine combined cycle of about 33.6 MW.

Cogeneration plant in Ajover

AJOVER

5MW cogeneration plant for the supply of steam, electricity and thermal oil to the chemical industry that AJOVER has in Cartagena de Indias (Colombia).

Cogeneration plant in Coelima

COELIMA

Planta constituida por un grupo motogenerador a fuel oil de 6,5 MW, con generación de 3.5 t/h de vapor por recuperación y agua caliente a 85 ºC.

Cogeneration plant in Clarianacal

CLARIANACAL, S.A.

The cogeneration plant, with a power output of 4MW, was based on a simple cycle with a gas turbine whose exhaust gases were used in three dryers.

Cogeneration plant in BASF - Tarragona

BASF-TARRAGONA

Simple cycle cogeneration plant with a 7MW gas turbine and a HRSG with afterburner which was designed to operate as an emergency plant and some years later was extended to 13 MW.

Cogeneration plant in Fibrán

ELYO SANT JOAN A.I.E.

Cogeneration plant based on a simple cycle with three gas engines able to produce about 5.8 MWe and 6.7 MWt of hot water at 90-92ºC.

Cogeneration plant in FYDSA

FORMOL Y DERIVADOS, S.A.

Cogeneration plant with a very unusual and particular configuration: a combined cycle with a gas engine and a backpressure steam turbine.

Cogeneration plant in Fuertes

FUERTES, S.A.

Cogeneration plant based on a 6.5 MW (on site) simple cycle with a diesel engine and a heat recovery steam generator that produced 5 t/h of saturated steam at 9 barg.

Cogeneration plant in Fibrarel

FIBRACOLOR

Combined cycle cogeneration plant based on an 8.8 MW gas turbine, whose exhaust gases were used to produce superheated steam (35 bar and 400ºC).

Cogeneration plant in Antex

GRUPO ANTEX

Simple cycle cogeneration plant based on a 6.5 MW fuel-oil engine to produce steam and hot water.

Cogeneration plant in Alco

COMPAÑÍA TÉRMICA PONTE DA PEDRA A.C.E.

Cogeneration plant with a fuel-oil engine in simple cycle, that can produce 3.2 t/h of saturated steam at 13 bar and hot water for production process.