Cogeneration plant in Azucarera Ebro

AZUCARERA EBRO

Applications

Tecnology

Combined cycle gas turbine

Power Range

From 10 to 25 MW

Fuel

Natural Gas

Country

Spain

City

Jerez de la Frontera (Cádiz)

Project

Azucarera Ebro decided to install a cogeneration plant in its facilities in Azucarera del Guadalete, coinciding with the enlargement of those facilities.

The cogeneration plant was based on a combined cycle with a 14.2 MW gas turbine and a backpressure steam turbine of 4.2MW (maximum output).

The heat recovery steam generator (HRSG) had an afterburner that operates with natural gas (it’s also able to operate with biogas from anaerobic digestion in the Industrial Wastewater Treatment Plant of the factory). The HRSG produced high and low pressure steam (41 t/h of steam at 37 bar(a) and 400ºC, and 4 t/h of saturated steam at 3,5 bar(a)).